Showing posts with label Rockaway Branch. Show all posts
Showing posts with label Rockaway Branch. Show all posts

Sunday, June 28, 2026

Transit access drives transit voting

Map of voting by election district in New York's Sixth Congressional District.  EDs for Chuck Park tend to be along transit lines - the #7, E, F, M and R trains and the Long Island Railroad's Port Washington Branch.  Superimposed on the map are planned train lines: the IBX, QueensLink and Lower Montauk branch, with stops at Jackson Heights, Grand, Eliot, Metropolitan, Queens Center, Parkside, Glendale, Maurice and Fresh Pond.  Competitive Advantage Research Data Mapper Representative in Congress 6th Congressional District - Democratic © Sam Hudis and Competitive Advantage Research, 2026. (sam@compadre.us). Like this site? Donate to help keep it running!  Sources: NYC Department of Planning, NYC Board of Elections Unofficial Results, as of 2026-6-28 22:31 ET. This data does not include Absentee votes.

I've been trying to show this for years with maps of car-free households, but there was a great example recently that used voting patterns directly.

Last Tuesday was the date for party primaries in New York State. In many of the races the differences between candidates was relatively subtle, particularly on transportation, but there was a clear difference in one race, for the Democratic nomination to represent the Sixth Congressional District.

The only transit issues that the incumbent representative, Grace Meng, seems to care at all about are reopening the Elmhurst station on the Long Island Railroad, accommodations for people with disabilities, and preventing attacks on Asian-American passengers. These are all good positions, but Meng doesn't seem to want to do anything about further transit expansion. She has not taken a position on congestion pricing, bicycle or transit improvements, and she has taken credit for expanding polluting highways in her district. She did not take the time for an interview with livable streets activist Miser.

The other candidate, Chuck Park, who lost the primary by a respectable 43% to 57%, said in his interview that he supports the 34th Avenue/Paseo Park bicycle boulevard, and wants to redirect federal money from highways to transit and bicycle infrastructure.

Chuck Park's 43% was a great showing for a relative unknown who's never held elective office and had no endorsement from advocacy organizations or elected officials. Looking at the preliminary vote map, at least two people have observed that the electoral districts that Park won at were almost all near subway or Long Island Railroad stations. This was not the only factor: Park strongly criticized the Israeli government's actions in Gaza, and failed to win several electoral districts near subways where support for the Israeli government is strong, but the transit pattern is very clear.

I've been talking about this since 2008: we want transit expansion because it's good for our goals reducing carnage and pollution, improving efficiency, increasing access for all. We also want it because more transit means more people who value transit over roads, and will elect officials like Chuck Park who promise to expand transit and defund roads.

Now what if I told you that Congressional District 6 has some transit expansion plans, some of which I've been talking about since 2008? These are all railroads that still exist. Some are abandoned, others are used for freight only. Two of them used to have passenger service, and all three could move passengers again.

You've probably heard of the Interboro Express, once known as the TriboroRx, which would have stations at Grand and Eliot Avenues, right in the middle of parts of Maspeth and Middle Village that went for Meng.

Chuck Park supports the QueensLink, the reactivation of service on the Rockaway Beach Branch, which would have a Parkside station at Metropolitan Avenue in southern Forest Hills. It's not currently part of the proposal, but I think there should also be a station at Fleet Street, which is convenient to several large apartment buildings that don't have good transit.

Have you heard about the Lower Montauk proposal, which would add stations at the edge of the district in Maspeth, Ridgewood and Glendale? I wrote about it in 2015. Some of the election districts near those station sites went for Park, but with relatively low turnout.

I've gotten a lot of pushback from fellow "transit advocates" because some of those proposals wouldn't "attract enough riders" to justify the cost of restoring passenger service. I'd be interested to see how those numbers have changed with the recent "City of Yes" upzoning. But it's not just about bringing in fares, or some abstract ridership numbers. It's also about attracting voters.

All these transit proposals have also gotten some flak from NIMBYs in the area, some of whom don't bother to disguise their racism. They may point to this post to justify a fear that they'll be replaced or swamped by Korean, Bengali or yuppie Chuck Park voters. I would say in response that New York is a city fundamentally built on inclusion and welcoming, which is the heart of Park's platform. Better transit access is key to that.

Note what you don't see on the electoral district map: the bike and bus lanes. The district hosts one of the best bike paths in the city, the Motor Parkway, and the neighborhoods around it all went for Grace Meng. There are two Select Bus Service routes that run through the district, on Main Street and Woodhaven Boulevard, and most of the electoral districts around them went for Meng. These patterns are correlated with rail service, whether it's subway or Long Island Railroad.

I think Chuck Park tapped into a movement, and he or a candidate with a similar platform may well win in 2028. But if we want to make it easier for candidates with his priorities win in the Sixth District and in other parts of Queens and Long Island, we should look to expand transit more. Can we get the Interboro Express open by 2028? Can we get shovels in the ground for QueensLink?

Interestingly, I saw a comment on Reddit supporting this analysis of the election results, by one of the lead advocates for "the QueensWay," a bike and walking proposal that would preclude transit service on the QueensLink. He was so close to getting it. Maybe he'll come around...

Friday, December 16, 2016

What if the MTA is interested in bringing back the trains?

I’ve always opposed the proposal to convert the Rockaway Beach Branch of the Long Island Railroad into a bike trail, because I think the land is too valuable as a rapid transit corridor to use for anything else. Trail advocates protest that they too are in favor of transit, and they wish we could bring transit back to the corridor, but gee, sadly the MTA is just not interested.


Not only was the MTA not interested, according to the trail pushers, but it was a waste of time to get them interested. Nobody in the area wants a train. The selfish NIMBYs would block any attempt by the MTA to rebuild the rails, and the parents whose kids use the ballfields “on” (actually near) the line would howl. The line will never be reactivated. But the NIMBYs wouldn’t oppose a park!

A few times they almost had me convinced. Against the power that has now arisen there is no victory, they whispered. Why not make the best of it? Have a nice rail trail. It'll close at dark, but in the wintertime we'll try to keep it open "slightly later" in case you're trying to ride home from work. You like the South County Trailway, don’t you? It’s not so bad!

So here it is a few years later, and it turns out that a lot of the NIMBYs have opposed a park. There are people in the area who are in favor of bringing the trains back. And the MTA is doing a study of reactivating train service! The bike trail advocates (who were really transit advocates that had given up hope, you remember) must be overjoyed!

Turns out that - surprise! - the bike trail advocates, now paid by the Governor and park-oriented nonprofits, are against reactivating the rails, and they’re repeating all the NIMBY arguments. The most bizarre one I’ve seen is that the noise of passing trains would distract students at three schools at the Metropolitan Avenue Campus. This is complete nonsense: my kid went to school for six years across the street from the noisy 7 train el and doesn’t remember ever being distracted by it, and the Rockaway Branch would have brand-new rails on an embankment. But as LLQBTT pointed out on Twitter, the presence of these schools is actually a point in favor of reactivating train service. Wouldn’t an Expeditionary Learning School be much better if the Expeditions could be taken by train? Wouldn’t it be better if kids could take the train to Little league practices instead of being driven by their parents?

The bike path advocates are also making up new, ostensibly pro-transit, arguments that don’t make sense to anyone who actually does transit advocacy. How many riders would we really expect to take the new Rockaway Beach Branch train to Kennedy Airport instead of the AirTrain, and why do we care? They indulge and amplify the fears of a handful of Rockaway residents that Rockaway Branch trains would “end the A train.” And if they believe that it would “cause slowing of trains” on the LIRR main line, why not support finishing the partly-built connection to the Queens Boulevard subway, as described by Capt. Subway?

The worst of all the arguments against bringing back the trains a legal one: that a section of the right-of-way was transferred to Forest Park, and that restoring the trains would constitute “alienation of parkland.” This is absolute hogwash. New York City parks are criss-crossed with transportation corridors, some of which are genuinely oppressive, destructive and deadly, and the City has not to my knowledge raised any legal objections. The Jackie Robinson Parkway - its name an insult to the athlete - has a much bigger negative impact on Forest Park than the Rockaway Beach Branch ever will. It would actually make a great busway and bike path, opening up the park to residents of some of the poorest Brooklyn neighborhoods, but the Trust for Public Land has shown no interest in it.

More than anything else, these statements by the bike trail advocates have given proof to my hunch that they are not in favor of transit, that they think a bike path is more important than anything, and that they are willing to lie through their teeth in order to get one.

Monday, January 5, 2015

The MTA is not interested

One cornerstone of the arguments for the Queensway rail-trail is that the MTA isn’t interested in restoring passenger rail service. Queensway advocate Peter Beadle tweeted, "point is MTA is not building a train, and new study only confirms prior MTA assessment that train not worth it." Former Parks Commissioner Adrian Benepe, now in charge of studying the rail-trail proposal for the Trust For Public Land, wrote, "The MTA and the LIRR have studied rail reactivation several times and each time concluded it's not feasible." The New York Times Editorial Board wrote, "Then there is the question of when the M.T.A. would get to this capital project, which would be one of many on its overflowing, underfunded to-do list. The likeliest answer is never. The M.T.A.’s capital plan is only half-funded; the agency is strapped by debt and is hard-pressed to protect the infrastructure it has."


There are actually two claims here: the MTA as expert, and the MTA as leader. Both of these are pretty bizarre claims to anyone who has ever dealt with the MTA. They are clearly meant not as real arguments, but as quick ways to silence opposition.

First, the "MTA as expert" claim relies on a series of dubious assumptions: The MTA is an organization of highly skilled, knowledgeable professionals. They have conducted a thorough cost benefit analysis of all service restoration possibilities, and decided that none of the possibilities would produce benefits that justify the cost. Their ideas of costs and benefits are in perfect alignment with those of both the rail and bikeway proponents, and their judgment is valid for eternity.

In reality the MTA does indeed employ many talented, well-educated people, but they also employ some ignorant and unimaginative ones, and there’s no guarantee that the right ones were studying the question. There is also no guarantee that the MTA’s priorities at the time of the study have any relationship to my priorities now. This is why I want to see the reports of "prior MTA assessment." These reports are not on the MTA website. Presumably the rail-trail advocates have copies, but with one exception they have not provided any, although they have been asked directly.

On December 30, one rail-trail proponent, Doug McPherson, posted a link to a 2001 study hosted on the Capital New York website. If you read the study, you can see why the trail advocates don’t want to share them: it was specifically investigating the value of train service as a one-seat ride between Midtown and Kennedy Airport, and didn’t consider the potential value to people going anywhere else. It put the basic cost of restoring the tracks and third rail at $250 million (about $350 million in today’s dollars), which is substantially lower than all the scary numbers that the trail advocates like to throw around.

I suspect that the other "several" studies cited by Benepe are similarly either irrelevant or supportive of restoring train service. Maybe someday one of the advocates will post a link so we can decide for ourselves. Maybe not, though: one advocate, Anandi Premlall, was "delighted" by a 2001 Wave article saying a report had recommended against restoring train service.

The "MTA as leader" claim is similarly suspect: the MTA must take the lead on all subway expansion. Their priorities never change, so if they have ever expressed a lack of interest in anything it is final, and no amount of public demand will convince them to do it.

The reality is that the MTA takes its lead from others. The Governor has enough control over the MTA Board that its Chair essentially serves at his pleasure; if he made it a priority, the MTA would make it a priority. The current Governor also controls a lot of pork in the form of the “Regional Economic Development Councils” that have steered a million dollars towards planning the trail.

The Mayor of New York City can also set priorities, as we saw with the extension of the #7 train to Twelfth Avenue. This was nowhere on the MTA’s priority list until Bloomberg decided he wanted it done and arranged the funding for it. A Mayor who can get similar funding could get this moved to the top of the list; so could a Senator or a powerful congressmember.

Rail-trail advocates’ claims that “it’s never going to happen” are just bluster, and their claims to want rail “if it were possible” are transparent lies. If these advocates spent the amount of time and political capital on getting train service instead of a bike trail, the city would be clearing trees right now.

Friday, December 19, 2014

Never trust a transit advocate

I’ve been fighting for better transit for over twenty years now, and one of the most important lessons I’ve learned is this: never trust a transit advocate.


I’m not saying that we’re all liars, or irresponsible, or anything like that. I’m saying that you don’t automatically know what it means when you hear that someone’s a transit advocate.

This is why I have my goals right up on top of the blog, and I keep coming back to them over and over. I’m not for transit, right or wrong. I don’t think transit is always right. Transit is a tool to get people out of their cars, bringing with them all the benefits of not driving (less pollution and carnage, more efficiency and better social life). Transit is also a tool to help make access to resources more fair. It’s not the only tool to accomplish either of those things, and it doesn’t automatically accomplish either of them, and I am happy to toss it aside if it looks like the wrong tool for the job. In general, though, it’s a good tool.

For other people, transit is not about any of these things, or all of these things. For one person, transit may be about pollution or efficiency, but not about carnage or social interaction. For another, it may be about social justice or charity, but not about pollution or carnage. For some it may be about questionable values like "mobility" or "cost effectiveness." For some it may be about bringing in consulting dollars, and for some it may be all about their own damn egos.

Here’s the thing: you can’t tell. You don’t know, just because someone is billed as a transit advocate, whether they are going to support the same projects you do. You don’t know that they’re not going to surprise you with some (edgy! counterintuitive!) stance against one of your favorite projects. You don’t know, and that’s why you shouldn’t trust them ... us.

Here are two "transit advocates" that you shouldn’t always trust – and why. The first is a group calling themselves "BRT for NYC." It’s run by our friend Joan Byron, who loves to propose half-baked "bus rapid transit" corridors, but is AWOL when it’s time to fight for them. She’s gotten together with habitual BRT proponents Transportation Alternatives and the Tri-State Transportation Campaign, snagged endorsements from the Straphangers Campaign and the Riders Alliance, and convinced the Rockefeller Brothers Foundation to put hundreds of thousands of Standard Oil dollars behind this agenda.

When shouldn’t you trust "BRT for NYC"? When their agenda is not about improving buses - or they would have some mention of citywide proof-of-payment or bus lanes on the Williamsburg Bridge or a 24-hour XBL. When it’s not about better transit or fair access to jobs for NYC - or there would be something in favor of the Utica Avenue subway and the Rockaway Beach Branch. When it’s not about getting dangerous cars out of NYC neighborhoods. When it’s all about taking a single model – center-running busways in large stroads – developed in cheap-labor, authoritarian countries like Brazil and Colombia for cities that didn’t have subways, and corralling government and transit-activist time and money trying to shoehorn it into expensive-labor, NIMBY-happy New York, over and over again, no matter how many times it fails.

The second transit advocate you shouldn’t always trust is the "Queens Public Transit Committee." Committee member Brendan Reed just co-authored an op-ed in the Queens Chronicle with Allan Rosen. Rosen worked as a bus planner for the MTA years ago and came up with what he says is a visionary plan to make the buses in southern Brooklyn much more efficient. The MTA didn’t appreciate his genius, so he took to forums and then blogging to get his ideas out. He has a small but dedicated following among the city’s transit advocates, especially those like the "Queens Public Transit Committee" who promote subways and the kind of government-monopoly bus service the city has been rolling out for the past eighty years.

When shouldn’t you trust the "Queens Public Transit Committee"? When their agenda is not about improving buses, but about avoiding any inconvenience to drivers. When they oppose incremental transit improvements while holding out for the particular improvement they want.

What this means is that you shouldn’t trust what either group says about bus service on Woodhaven Boulevard. Yes, Woodhaven is a big, nasty stroad running through areas without good subway service. Yes, dedicated bus lanes would calm the boulevard and help people get places. Yes, those lanes would inconvenience some drivers.

But no, Joan Byron, dedicated bus lanes will not magically solve all the problems of people who live in the area. They will not beautify the boulevard by their mere terra-cotta-painted presence. They are no substitute for reactivated train service on the Rockaway Beach Branch.

And no, Allan Rosen, inconveniencing drivers is not a reason to reject a transit plan. Congestion does not put pedestrians at greater risk. The existence of dedicated bus lanes on Woodhaven will not magically drain the support for reactivated train service on the Rockaway Beach Branch.

The thing is that it’s easy to tell when to trust these guys or not. They say it right there. "BRT for NYC" has it in their name: they’re only interested in helping transit if it’s the right kind of transit. Allan Rosen and Brendan Reed say it in their op-ed: "questions posed by the Queens Public Transit Committee in early 2014 requesting a comparison of the positives and negatives for all users of the roadway, not only bus riders."

You can’t always go by the name. Someone may have "transit" in their name, and not always be in favor of transit. You have to look at their goals, and their arguments. And honestly, I'm creeped out by the level of obsession that both Byron and Rosen have demonstrated over the years, Byron for "BRT" and Rosen for the perfect bus map. I'm not convinced that either of them care about much beyond themselves and their personal white whales.

I’ve got "transit" in my name. Should you trust me? No! Read my agenda; it's right up at the top of this blog. I’m in favor of both dedicated bus lanes on Woodhaven Boulevard and reactivation of the Rockaway Beach Branch, because they would both help to make access fairer and get people out of their cars. Hell, I'd be in favor of the Tappan Zee Bridge if I thought it would do that. Are those your goals too?

Monday, November 17, 2014

When bike paths are not transportation

I've written before about the capacity of bike paths to move large numbers of people. A dedicated bike path performs this function best when it connects dense residential neighborhoods with dense job centers. The bike paths on the Brooklyn, Manhattan, Williamsburg and Queensboro Bridges are great examples of this. They may not transport as many people in a day, but they don’t transport thousands of dangerous, wasteful motor vehicles either. This is why we should convert one lane of the Brooklyn Bridge to a two-way bike path.

That said, a frequent train line can beat a bike path, or even a car lane, any day. On the Manhattan Bridge one fall day in 2012, according to the New York Metropolitan Transportation Council’s Hub-Bound Travel Study, one car lane carried almost five times as many people as the bike lane, but one subway track carried 36 times as many.


With that in mind, let’s turn to the Rockaway Beach Branch, and to a proposal to convert it to a bike trail instead of reactivating train service. The Trust for Public Land argues that it “will” (not “could”) fulfill a similar transportation function:

Using the QueensWay to connect to subway stations, commuters could save 15 – 20 minutes each way to major work destinations such as Midtown Manhattan and Downtown Brooklyn. Residents will also be able to use the QueensWay to connect to stores and other destinations. … Using the QueensWay to connect to subway stations, commuters could save 15 – 20 minutes each way to major work destinations such as Midtown Manhattan and Downtown Brooklyn. Residents will also be able to use the QueensWay to connect to stores and other destinations.

Yes, that’s nice, but how many of them would actually use it? I could save ten to fifteen minutes off my commute by biking to the subway station, but I don’t do it because there’s just a plain rack to lock it to. There is no secure bike parking at any subway station near me, and there is none proposed in the trail plan.

Even assuming that secure parking was built, or that every potential bike commuter was comfortable locking their bike up at a plain old rack (and that the city built enough additional plain old racks to accommodate them, how many cyclists are we talking about? I’m guessing it would be far below the 2,601 cyclists that the NYMTC counted on the Manhattan Bridge on that fall day in 2012.

Now let’s assume that instead we brought trains back to the Rockaway Beach Branch. Let’s assume that the service is the crappiest possible: less than once an hour off-peak and a mandatory change to get to Manhattan, like the Long Island Rail Road Oyster Bay Branch. We would still get at least 3,350 riders a day (PDF).

If instead we dug a tunnel under a few blocks of Rego Park and ran the R train out to Howard Beach, we would see a lot more riders. Even if there were only four stations and all of them had the ridership of the 104th Street station on the A train (1,736), that would still be almost 7,000 riders a day. The least popular station on the R train, 36th Street in Long Island City, saw 4,540 riders last year, and I’ve proposed adding stations at Myrtle Avenue and Fleet Street to serve large buildings that were built since the line’s fortune declined. The half million riders heralded by some rail proponents may be too ambitious, but even if the line is a dismal failure it would serve far more people per day than a trail.

If you’re still thinking of the bike trail as a transportation project, look at this quote from the Trust for Public Land:

To ensure safety and security for neighbors and park users, the QueensWay will have gates at all entrances. The QueensWay will close at dusk except during winter months, when it will remain open slightly later to accommodate commuters.

(I’m pretty sure that last part about remaining open slightly later was added after I tweeted about this.) The bike paths on the Brooklyn, Manhattan, Williamsburg and Queensboro Bridges are open twenty-four hours. That’s because they’re transportation infrastructure, not parks.

Wednesday, April 2, 2014

Light rail in New York City?

Last week I talked about the practical differences between light rail, streetcars, subways and commuter rail. We have light rail right across the river in Hudson County, and there have been several proposals for streetcars and light rail here in New York City. I want to mention a few possibilities and discuss their technical and political feasibility.

As I pointed out last week, the lower construction cost of streetcars and light rail comes primarily from shorter, lighter trains and lack of grade separation. These in turn limit your capacity and speed, meaning that if you build the wrong system you can wind up with overcrowded trains and frustrated passengers, and not get as many people out of their cars as you could with a heavier system. The consequences of this in turn are that if you can afford light rail, don't build a streetcar. If you can afford a subway or an el, don't build light rail.

With that in mind, consider Raanan Geberer's suggestion, "How about light rail on the old Rockaway line?" Geberer is clearly a supporter of transit and he's trying to be helpful, but the old Rockaway Beach Branch is completely grade-separated. It should be returned to Long Island Rail Road trains, or connected to the subway, along the lines of Capt. Subway's proposal, to take full advantage of its potential.


Some of the supporters of rail on the Rockaway Beach Branch have mentioned the possibility of running light rail from Rockaway Park or Ozone Park onto the old "Lower Montauk" branch to Long Island City. The problem is that there are at least two freight trains a day that use those tracks. Because of the Federal Railroad Administration rules, the only way to run light rail would be to limit the freight trains to overnight hours. Unfortunately, I don't see enough potential ridership to justify that time separation. It might be more feasible to run a short diesel-multiple-unit shuttle, especially if it could be done without paying a lot of conductors.

So why do people like Geberer seem to think light rail would be so much better than subways or commuter rail? They are claimed to be quieter, but this is not really true. Yes, the heavier the train the more noise it makes, but that's a relatively minor factor. The noise is primarily a function of the supporting structure. The #7 train is elevated on reinforced concrete in Sunnyside and plain old steel everywhere else. You can have a conversation under the el in Sunnyside, but not in Woodside or Corona. This would not change significantly if you ran light rail trains on the same structures.

The main argument given by proponents of light rail on these lines is that it is somehow more modern than subways or commuter rail. This is nonsense: many of the tracks of the Hudson-Bergen Light Rail saw trains long before subways ran in New York City, and many of the cars in use on the New York subway and the Long Island Railroad are newer than the cars on the HBLR.

Sadly, this seems to be another case of what Ryan McGreal called "cargo cult urbanism": if it works in Jersey City and Phoenix and Seattle, it should be the hot new thing here in New York. (Cyclists who promote "BRT" as a panacea seem to have a similar shallowness of thinking.) In part, it's because many of the most ambitious new train lines are being built as light rail in places like Salt Lake City and Charlotte.

The thing is that those lines are being built as light rail for two reasons: (1) freight railroads have been abandoning their less-used lines all over the country, and (2) any new rail lines have faced such stiff competition from new highways that ridership projections haven't justified grade separation. Neither of those apply here in New York City. There is still a market for freight trains on the Bushwick, Bay Ridge and Montauk Branches and the Oak Point Link in the Bronx. None of these railroads are going to be abandoned any time soon. And there is such demand for transit that we could pack any new light rail trains that are run.

So I've pretty much ruled out mixed-traffic streetcars and legacy-freight light rail here in New York City. The one area where light rail or streetcars would make sense here is if we can dedicate lanes to them. If we can dedicate lanes to buses, we can dedicate them to streetcars or light rail. I looked at this issue almost six years ago, but it might be time for a re-look soon.

Sunday, June 2, 2013

Buses and trains in Woodhaven

In this blog, Capt. Subway has written that we should run the R subway on the unused Rockaway Beach Branch of the Long Island Railroad, and I've written that we should run Select Bus Service on the parallel Woodhaven Boulevard.



On one of my followup posts, BBnet3000 argued that the Rockaway Branch is not well enough located:

Also, most of the commercial development in this area is along Woodhaven Boulevard, which this subway kind of misses. Theres a reason subways are usually built under streets. When I ride the bus on Woodhaven Boulevard (to go to the auto-oriented Trader Joes incidentally, though Forest Park is also worth visiting) I usually think id like a better bus, rather than a train a block to the east (for what its worth, this bus seems to have pretty good ridership, and a lot of people DO ride it to the Rockaways in the summer). For the densest parts of Woodhaven its several blocks to the east and inaccessible through the private properties of the Rego crescent.

There is in fact walkable commercial development along that section of Woodhaven Boulevard from 62nd Drive to where the cemetery starts at Furmanville Road, but that's the only walkable commercial development the entire length of the boulevard. North of 62nd Drive you've got an apartment complex, a Catholic school parking lot, a deli and a park before you get to Queens Boulevard and the subway station. South of Furmanville Road you have the cemetery on one side and sprawly stores on the other, then the big-box stores, then the Montauk Branch.

South of the Montauk Branch there are a few businesses, but they are almost all located on street corners. The vast majority of commercial use in this corridor is on the avenues that cross it: Metropolitan, Myrtle, Jamaica, Atlantic, 101st and Liberty Avenues. On Woodhaven itself you see mostly houses - and a lot of one-car garages.



If you walk down one of those avenues, the Rockaway Branch is never far away.



One thing to remember is that this is not just about better access to existing businesses, but enticing more and better businesses to locate there. The commercial buildings along the avenues are generally two stories, allowing for greater walkability - more shops, restaurants and offices in a small area. The ones on Woodhaven Boulevard are mostly one story, which limits their potential.

So yes, Select Bus Service would be good for the commercial stretch of Woodhaven north of Saint John's Cemetery, but a subway would be better for businesses further south in that corridor. That's why we should have both.

Sunday, April 28, 2013

Apartment buildings near the Rockaway Branch

In 2011, Alon Levy wrote this about the possibility of restoring service on the Rockaway Beach Branch Railroad in Central Queens:

Observe the land use maps of Queens Community Boards 6 (PDF) and 9 (PDF), which host most of the Cutoff: along the Cutoff’s right of way, the primary uses are single-family residential, with only a little commercial. Moreover, the commercial development is often very auto-oriented, for example at Metropolitan Avenue. Indeed, the only proposed station with significant dense development is Rego Park, which is on the LIRR Main Line and could be restored without restoring an entire line. Rezoning near the other stations is possible, but why not rezone near existing subway stations first?

Sure, on the map there are lots of single-family residential areas, but if you go there you see things like the Forest Park Co-ops:


When I took this picture I had my back to the fence enclosing the right-of-way. These are dense developments, with hundreds of residents. There's another condo across Park Lane South that used to be a factory. A little further north you see Forest View Crescent:


This massive twenty-story co-op sits right next to the right-of-way; in fact, one of the initial obstacles when the MTA tried to restart service in the 1960s was the fact that the co-op is using the right-of-way for their parking lot. A few blocks north is the commercial development along Metropolitan Avenue that Alon mentions:
This is indeed auto-oriented, especially the Home Depot and the Metropolitan Avenue Educational Campus, but it is not irredeemable. The Trader Joe's draws people from all over Central Queens, and not just by car. Look at the number of people waiting for the bus across the street, at noon on a Monday:


There were similar numbers waiting on my side of the street for the eastbound bus, and on Woodhaven Boulevard for the buses going north and south. Just a block east of the Rockaway Branch is the beginning of a relatively dense, walkable two-story commercial district along Metropolitan. Finally, north of there is another area of apartments around Fleet Street:


Because of this, I think the Rockaway Branch would get more riders if it had stops at Fleet Street and Myrtle Avenue, in addition to the old stations at Parkside (Metropolitan Avenue) and Brooklyn Manor (Jamaica Avenue). Between residents going to work and shopping, and people coming in to the schools and shops, there are hundreds of people who currently drive or take the bus or slow train. Rezoning the area near the Parkside station to allow more dense development would bring even more riders.

Monday, April 15, 2013

In 2013, subways raise property values

Suppose that you live in a detached single-family home a block from the old Brooklyn Manor train station in Woodhaven. Your neighbors are selling a house a lot like yours, containing about 2000 square feet of floor area on a 5,000 square foot lot abutting the Rockaway Beach Branch railroad embankment, for $439,000.

That's one of the few houses that can even be sold; Zillow says that 20-30% of mortgages in this area are underwater. You want to see your property values go up. Maybe your mortgage is underwater; maybe you just want to get a good price when you're ready to sell. What can you do? Reactivate the railroad.


Your house is currently an hour door-to-door from downtown Manhattan on the rickety, unreliable J or Z tracks. If you're trying to get to Midtown, where there are more jobs, you would have to change for the F or M trains, adding another fifteen minutes. But what if you could cut that travel time to forty-five minutes, say by running the R train on the Rockaway Branch tracks? We don't have to imagine; we can just look at a very similar train line.


This 15000 square foot house, 2163 East 15th Street in Brooklyn, is currently for sale at $489,000. That's $50,000 more than your neighbor is asking, for a house that's a little smaller. Okay, your neighbor's house has termite damage, but it also has a huge back yard with no trains running on the tracks.

If you compare properties along the Q train in Sheepshead Bay and Homecrest you find that they're typically $100-200,000 more than you would get for "comparable" properties along the Rockaway Branch, like this 1600 square foot semi-attached house asking $729,000. And according to Zillow, only 5-10% of mortgages are underwater. That 15-30 minute difference in commute time makes a big difference in home prices. Crime is lower, too.

This may be a surprise to you. You may remember the sixties and seventies, when properties near active train lines went down in price and properties near highways went up. Things have changed. People can't afford to drive, and they're realizing that the train and the city aren't so bad.

What about the opposite problem, gentrification? Well, I took a walk through Sheepshead Bay yesterday, and let's just say I didn't see any creative facial hair or skinny jeans. Don't take my word for it; go look for yourself.

Reopening the Brooklyn Manor train station would be a huge boon to people who live nearby. But you can only do it if you get out of the 1970s mental traffic jam and ride the train into the twenty-first century. Please, sign the two petitions to reopen the Rockway Beach Branch, on change.org and on Assemblymember Goldfeder's site.

Monday, January 21, 2013

Guest Post: How sending the R train to Howard Beach can help the G go to Forest Hills

By Capt. Subway

The controversy over what to do with the 3.5-mile long abandoned northern section of the defunct LIRR Rockaway Line between Ozone Park and Rego Park has once again made it into a major newspaper, in this case in an article in the New York Times about a week ago. In that article we learned that the state will be awarding a $500,000 grant to the Trust for Public Land to study the QueensWay proposal to turn the abandoned railroad right-of-way into a linear park and biking/walking trail. It is rather curious that no equivalent grant is being made to the groups – and such people and groups do exist – advocating that the line should be resurrected as a – hold your hats - rail line. An extension of the "R" subway line, in fact.


The advocates for the Greenway insist that the revived line would accomplish little and that few people would ride. Oh really – a line that parallels the heavily trafficked Woodhaven Boulevard corridor – a line that would provide a one seat connection from densely settled Queens neighborhoods like Rego Park, Jackson Heights, Woodside, Astoria and Long Island City to East and West Midtown, that would provide possible transfer connections to the IND "A" and BMT "J" lines, and that would also serve neighborhoods of moderate density in central Queens that have no heavy rail access at this time – no one’s going to ride it?

Furthermore the Greenway crowd says that reviving the line would be too costly. Yes much work would be needed to get it back up and running. But as compared to constructing a wholly new rail line the cost of getting the defunct line back in working order would be a genuine bargain, probably around one tenth the cost of new construction.


Many people have argued that the line should be reactivated as a branch of the Long Island Rail Road. This would be better than a greenway, but not as good as a connection to the Queens Boulevard subway line. The capacity of the Queens Boulevard line is determined by a combination of signaling along each of its four tracks and by its terminal capacity, i.e. the ability of the terminal stations, 71-Continental Avenue-Forest Hills, 179th Street and Parsons/Archer to process or relay arriving and departing trains. The express tracks are, happily, operating at the current design capacity of 30 trains per hour.

Unfortunately the local tracks, while also theoretically capable of 30 trains per hour, are presently only running at about 20 trains per hour in the peak period. This is necessitated by the terminal at 71-Continental, which can only turn around about 20 trains per hour at the limit, and that not very well. For this reason the 63rd St connection to Queens Boulevard required a "robbing from Peter to pay Paul" switcheroo: the "G" line had to be cut back to Court Square and its slots on Queens Boulevard given over to another, Manhattan oriented service, first to the "V", and now to the "M". (For the first few years the “G” line ran to and from Forest Hills nights and weekends, when there was no "V" train service. But this passenger friendly part-time service died to make weekend service changes more doable).

Of course it needn’t be that way. Even in the original MTA plans from the late ‘60s "G" service would have remained intact. The express by-pass alone would have insured this. This is where the old LIRR Rock Line comes into play. By connecting this line to the Queens Boulevard line east (subway north) of 63rd Drive station – the tunnel bell mouths are there specifically for that scenario – the path to another local service terminal would be created, i.e. now the "G", along with the "M" and "R" could run along the Queens Boulevard local tracks, with one of these service branching off after 63rd Drive and heading off to a new terminal at either Howard Beach or, it would be hoped, JFK, and thus not threatening to overwhelm 71-Continental as a terminal. In this way peak trains per hour on the Queens Boulevard local tracks could be raised from the present day 20 trains per hour up to 27 ½ trains per hour, given the current timetables on those three lines. This would be a significant improvement in service, especially if the "G" were equipped with full length trains.

These are the transit advantages of reactivating the Rockaway Branch as a subway line. Neighborhoods like Woodhaven, Rego Park and Ozone Park get quicker service to Midtown. Greenpoint and Williamsburg can be reconnected to Astoria and Jackson Heights with revived G train service. Local stations on the Queens Boulevard line see seven more trains an hour.

These benefits are worth the money. This is something we can do. If you agree, sign our petition to Governor Cuomo and be counted.

Capt Subway is a Queens resident and transit advocate with 37 years of experience working for the New York City Transit Authority, including Senior Schedule Manager. He has had his alias for at least as long as I've had mine.